default_image
© Khunaspix Dreamstime.

Volga-Dnepr Airlines’ Engineering & Logistics Centre (ELC) sped into action to complete the urgent delivery of a 40-ton propeller shaft for a ship in Brazil.
The 16-metre spare part was secured inside a special transport frame and loaded onboard one of Volga-Dnepr’s IL-76TD-90VD freighters using a trailer and cranes organized by the ELC team.

Comment on this article