![default_image](https://theloadstar.com/wp-content/uploads/13922cb295c5b0149c044ccb586fe589-680x0-c-default.jpg)
It has started. A semi-conductor factory is opening in Saratoga, outside New York. It cost $1 billion more than it would have cost to build outside the US. But with subsidies from the state, and suppliers starting to flock, it could be the start of a something new. And the forwarders are already moving in too.